This metro line is under construction in Australia. It comprises 8.5 km of tunnels and 130 km/h design speed. The line uses 25 kV AC 50 Hz electrification, CBTC signalling and 1067 mm Cape gauge. METRONET Office and Public Transport Authority of Western Australia are delivering the project. It opened in 2024, with an investment of USD 0 m.
1067mm25kV ACCBTC130 km/h
Bangkok Yellow Line Monorail (Lat Phrao – Samrong)
Thailand · Asia
Operational
Monorail
This 30.4 km monorail line entered service in Thailand. It comprises 23 stations and 80 km/h design speed. The line uses 750 V DC third rail electrification and CBTC signalling. Mass Rapid Transit Authority of Thailand (MRTA) is delivering the project, with Eastern Bangkok Monorail (BSR consortium: BTSC + Sino-Thai + RATCH) and Alstom (Innovia 300) as main contractors. It opened in 2023, with an investment of USD 1.5 bn.
750V 3rd RailCBTCGoA480 km/h23 stations30.4 km
Brazil Fortaleza Metro Line South
Brazil · Americas
Operational
Metro
This 13.4 km metro line entered service in Brazil. The line uses 3 kV DC overhead electrification and 1000 mm metre gauge. It opened in 2012, with an investment of USD 0 m.
1000mm3kV DC120 km/h10 stations13.4 km
Canada Vancouver Broadway Subway
Canada · Americas
Under Construction
Metro
Extension of SkyTrain Millennium Line along Broadway corridor to UBC area in Vancouver.
CBTC6 stations5.7 km
Dubai Metro Blue Line
UAE · Middle East
Planning
Metro
This 30 km metro line is in pre-feasibility stage in UAE. The line uses CBTC signalling and 1435 mm standard gauge. It opened in 2011, with an investment of USD 5.6 bn.
1435mmCBTCGoA4110 km/h14 stations30 km
Israel Tel Aviv Light Rail Green Line
Israel · Middle East
Under Construction
Light Rail
This 39 km light rail line is under construction in Israel. The line uses 1.5 kV DC overhead electrification, CBTC signalling and 1435 mm standard gauge. Under construction since 2019, the line is scheduled to open in 2021, with an investment of USD 0 m.
1435mm1.5kV DCCBTCGoA280 km/h62 stations39 km
Israel Tel Aviv Light Rail Red Line
Israel · Middle East
Operational
Light Rail
This 85 km light rail line entered service in Israel. The line uses 1.5 kV DC overhead electrification and 1435 mm standard gauge. It opened in 2023, with an investment of USD 4.7 bn.
1435mm1.5kV DCGoA270 km/h34 stations85 km
Jakarta LRT Jabodebek
Indonesia · Asia
Operational
Light Rail
This 41.2 km light rail line entered service in Indonesia. It comprises 18 stations and 90 km/h design speed. The line uses 750 V DC third rail electrification, moving-block signalling and 1435 mm standard gauge. PT Kereta Api Indonesia (KAI) is delivering the project, with PT Adhi Karya and PT INKA as main contractors. It opened in 2023, with an investment of USD 1.5 bn.
1435mm750V 3rd RailMoving BlockGoA490 km/h18 stations41.2 km
Kuala Lumpur LRT3 Bandar Utama – Johan Setia (Shah Alam Line)
Malaysia · Asia
Under Construction
Light Rail
This 37.8 km light rail line is under construction in Malaysia. It comprises 20 stations and 2 km of tunnels. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Prasarana Malaysia is delivering the project, with MRCB-George Kent JV as main contractor. Under construction since 2017, the line is scheduled to open in 2025, with an investment of USD 2.2 bn.
1435mm750V 3rd RailCBTCGoA480 km/h20 stations37.8 km
Manila Metro Rail Transit Line 4 (Ortigas – Taytay)
Philippines · Asia
Planning
Monorail
This 12.7 km monorail line is in procurement in Philippines. It comprises 11 stations. The line uses 1500 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Department of Transportation Philippines (DOTr) is delivering the project. Target opening is 2031, with an investment of USD 7.0 bn.
1435mm1500v Dc Third RailCBTCGoA480 km/h11 stations12.7 km
Melbourne Metro Tunnel
Australia · Oceania
Operational
Metro
This 9 km metro line entered service in Australia. It comprises 5 stations and 9 km of tunnels. The line uses 1.5 kV DC overhead electrification, CBTC signalling and 1600 mm Iberian gauge. Rail Projects Victoria and Department of Transport and Planning Victoria are delivering the project, with Cross Yarra Partnership (Lendlease, John Holland, Bouygues Construction, Capella Capital — PPP Tunnels & Stations), Rail Systems Alliance (CPB, AECOM, Metro Trains Melbourne) and Rail Network Alliance (John Holland, KBR, Metro Trains, Rail Projects Victoria) as main contractors. It opened in 2025, with an investment of AUD 12.8 bn (~USD 8.6 bn).
1600mm1.5kV DCCBTC80 km/h5 stations9 km
Mexico Toluca-Mexico City Interurban Train
Mexico · Americas
Operational
Commuter Rail
This 57.7 km commuter rail line entered service in Mexico. The line uses 1435 mm standard gauge. It opened in 2023, with an investment of USD 0 m.
1435mm160 km/h7 stations57.7 km
Qatar Lusail Tram
Qatar · Middle East
Operational
Tram
This 28 km tram line entered service in Qatar. The line uses CBTC signalling and 1435 mm standard gauge. It opened in 2022, with an investment of USD 2.2 bn.
1435mmCBTC25 stations28 km
Sydney Metro Western Sydney Airport
Australia · Oceania
Under Construction
Metro
This 23 km metro line is under construction in Australia. It comprises 6 stations, 9.8 km of tunnels and 100 km/h design speed. The line uses 1.5 kV DC overhead electrification, CBTC signalling and 1435 mm standard gauge. Sydney Metro (Transport for NSW) is delivering the project, with CPB Contractors-Ghella-UGL JV (SSTOM tunnels), Bouygues-Acciona JV (stations enabling) and Parklife Metro consortium (Webuild, Siemens Mobility, RATP Dev, Plenary Group) — SSTOM PPP as main contractors. Under construction since 2020, the line is scheduled to open in 2027, with an investment of AUD 12.0 bn (~USD 8.0 bn).
1435mm1.5kV DCCBTCGoA4100 km/h6 stations23 km
Chittagong-Cox's Bazar Railway Phase 1 (Dohazari-Cox's Bazar)
Bangladesh · Asia
Operational
Conventional Rail
This 102 km conventional rail line entered service in Bangladesh. It comprises 9 stations. The line uses diesel traction and dual-gauge track. Bangladesh Railway is delivering the project, with China Civil Engineering Construction Corporation (CCECC) and Max Infrastructure as main contractors. It opened in 2023, with an investment of USD 1.5 bn.
DualNon-Elec100 km/h9 stations102 km
Egypt Cairo Metro Line 6
Egypt · Middle East
Operational
Metro
This 38.1 km metro line entered service in Egypt. The line uses 1.5 kV DC overhead electrification, CBTC signalling and 1435 mm standard gauge. It opened in 2022, with an investment of USD 3.5 bn.
This 6.7 km light rail line is under construction in Australia. It comprises 8 stations. The line uses 750 V DC overhead electrification and 1435 mm standard gauge. Queensland Government Department of Transport and Main Roads and GoldlinQ are delivering the project, with John Holland as main contractor. Under construction since 2023, the line is scheduled to open in 2026, with an investment of AUD 1.2 bn (~USD 805 m).
1435mm750V OH8 stations6.7 km
Ho Chi Minh City Metro Line 2 (Bến Thành – Tham Lương)
Vietnam · Asia
Planning
Metro
This 11.3 km metro line is in procurement in Vietnam. It comprises 11 stations, 9.3 km of tunnels and 110 km/h design speed. The line uses CBTC signalling and 1435 mm standard gauge. Ho Chi Minh City Urban Railway Authority (MAUR) is delivering the project. Target opening is 2030, with an investment of USD 0 m.
1435mmCBTCGoA4110 km/h11 stations11.3 km
Montenegro Bar-Belgrade Railway Modernisation
Montenegro · Europe
Under Construction
Conventional Rail
This 250 km conventional rail line is under construction in Montenegro. The line uses 25 kV AC 50 Hz electrification and 1435 mm standard gauge. It opened in 1976, with an investment of USD 80 m.
1435mm25kV AC120 km/h10 stations250 km
Romania Bucharest Metro Line 6
Romania · Europe
Under Construction
Metro
This 17.8 km metro line is under construction in Romania. The line uses 750 V DC third rail electrification and 1435 mm standard gauge. Under construction since 2023, the line is scheduled to open in 2028, with an investment of USD 0 m.
1435mm750V 3rd Rail100 km/h16 stations17.8 km
USA Maryland Purple Line
United States · Americas
Under Construction
Light Rail
This 26 km light rail line is under construction in United States. The line uses 1.5 kV DC overhead electrification and 1435 mm standard gauge. Under construction since 2017, the line is scheduled to open in 2027, with an investment of USD 9.3 bn.
This 31.6 km light rail line entered service in Ethiopia. It comprises 39 stations and 70 km/h design speed. The line uses 750 V DC overhead electrification, national ATC signalling and 1435 mm standard gauge. Ethiopian Railways Corporation is delivering the project, with China Railway Engineering Corporation as main contractor. It opened in 2015, with an investment of USD 475 m.
1435mm750V OHATC70 km/h39 stations31.6 km
Alexandria Metro
Egypt · Middle East
Under Construction
Metro
Conversion of the historic Abu Qir suburban railway into a 22 km, 20-station metro with CBTC and 25 kV AC 50 Hz electrification. Delivered by NAT with NERIC + Hyundai Rotem. EUR 1.76 bn, opening 2028.
1435mm25kV ACCBTC100 km/h20 stations22 km
Cebu BRT
Philippines · Asia
Under Construction
Other
This 13.18 km rail project is under construction in Philippines. It comprises 17 stations and 80 km/h design speed. It opened in 2026, with an investment of USD 0 m.
80 km/h17 stations13.18 km
1,123 more railway projects available on the Essential plan
Free plan shows the first 50. Upgrade to unlock the full Railex database.
Railex uses essential cookies to keep you signed in and your preferences saved. Optional analytics — Plausible (cookieless visit stats), Microsoft Clarity (anonymised heatmaps & session recordings) and first-party event tracking — help us understand how the site is used. None of these load until you say yes. Cookies Policy · Privacy Policy.