Kuala Lumpur LRT3 Bandar Utama – Johan Setia (Shah Alam Line)
Malaysia · Asia · Light Rail
Project overview
This 37.8 km light rail line is under construction in Malaysia. It comprises 20 stations and 2 km of tunnels. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Prasarana Malaysia is delivering the project, with MRCB-George Kent JV as main contractor. Under construction since 2017, the line is scheduled to open in 2025, with an investment of USD 2.2 bn.