AIFA–Pachuca Train (Mexico City–Pachuca Corridor)

This 57.56 km commuter rail line is under construction in Mexico. It comprises 8 stations and 130 km/h design speed. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm Tren Interurbano México–Toluca (El Insurgente) — Full Line · Tren Maya (Mayan Train) — Full Network · Tren México–Querétaro Passenger Corridor · News

AIFA–Pachuca Train (Mexico City–Pachuca Corridor) is a commuter rail project in Mexico, currently under construction.

This 57.56 km commuter rail line is under construction in Mexico. It comprises 8 stations and 130 km/h design speed. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. SEDENA is delivering the project, with SEDENA Cuerpo Ingenieros Felipe Ángeles and CRRC Zhuzhou as main contractors. Under construction since 2025, the line is scheduled to open in 2027, with an investment of MXN 44.0 bn (~USD 2.4 bn).

Construction began in 2025, with completion expected in 2027.

The project has an estimated investment of MXN 44.00B.

Country
Mexico
Status
Under Construction
Investment
MXN 44.00B
Expected opening
2027
Length
57.56 km