All railway projects
BART Transbay Corridor Core Capacity Program (CBTC + Fleet)
United States · Americas · Metro
Under ConstructionCapex: $3.50B
Project overview
This signalling upgrade in United States, deploying CBTC. The line uses 750 V DC third rail electrification, CBTC signalling and 1676 mm Indian broad gauge. Bay Area Rapid Transit (BART) is delivering the project, with Hitachi Rail STS USA ($798m CBTC D-B) as main contractor. Under construction since 2020, the line is scheduled to open in 2032, with an investment of USD 3.5 bn.
Type
Metro
Country
United States
Region
Americas
Status
under construction
Investment
$3.50B
Related railway projects
Browse all projectsUSA Los Angeles Metro D Line Extension
United States
Brightline West (Las Vegas – Rancho Cucamonga High-Speed Rail)
United States
USA Phoenix Valley Metro Extension
United States
USA Portland MAX Orange Line Extension
United States
Brightline Florida (Miami–Orlando, Phases 1–2)
United States
Bangkok Yellow Line Monorail (Lat Phrao – Samrong)
Thailand

