This 57.7 km commuter rail line entered service in Mexico. It comprises 7 stations and 160 km/h design speed. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standar AIFA–Pachuca Train (Mexico City–Pachuca Corridor) · Tren Maya (Mayan Train) — Full Network · Tren México–Querétaro Passenger Corridor · News
Tren Interurbano México–Toluca (El Insurgente) — Full Line is a commuter rail project in Mexico, currently operational.
This 57.7 km commuter rail line entered service in Mexico. It comprises 7 stations and 160 km/h design speed. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. SICT is delivering the project, with CAF, Isolux-Corsán and AZVI as main contractors. It opened in 2026, with an investment of MXN 115.0 bn (~USD 5.8 bn).
Construction began in 2014 and the project opened in 2026.
The project has an estimated investment of MXN 115.00B.