Tren Interurbano México–Toluca (El Insurgente) — Full Line

This 57.7 km commuter rail line entered service in Mexico. It comprises 7 stations and 160 km/h design speed. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standar AIFA–Pachuca Train (Mexico City–Pachuca Corridor) · Tren Maya (Mayan Train) — Full Network · Tren México–Querétaro Passenger Corridor · News

Tren Interurbano México–Toluca (El Insurgente) — Full Line is a commuter rail project in Mexico, currently operational.

This 57.7 km commuter rail line entered service in Mexico. It comprises 7 stations and 160 km/h design speed. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. SICT is delivering the project, with CAF, Isolux-Corsán and AZVI as main contractors. It opened in 2026, with an investment of MXN 115.0 bn (~USD 5.8 bn).

Construction began in 2014 and the project opened in 2026.

The project has an estimated investment of MXN 115.00B.

Country
Mexico
Status
Operational
Investment
MXN 115.00B
Opened
2026
Length
57.7 km