This 27 km commuter rail line entered service in Mexico. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. Gobierno Federal MX is delivering the projec AIFA–Pachuca Train (Mexico City–Pachuca Corridor) · Tren Interurbano México–Toluca (El Insurgente) — Full Line · Tren Maya (Mayan Train) — Full Network · News
Tren Suburbano ZMVM — Nationalization 2024 is a commuter rail project in Mexico, currently operational.
This 27 km commuter rail line entered service in Mexico. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. Gobierno Federal MX is delivering the project, with Ferrocarriles Suburbanos (nationalized) as main contractor. It opened in 2008, with an investment of MXN 5.9 bn (~USD 295 m).
Construction began in 2024 and the project opened in 2026.
The project has an estimated investment of MXN 5.90B.