This 84 km commuter rail line is under construction in Mexico. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. SEDENA and SICT are delivering the pro AIFA–Pachuca Train (Mexico City–Pachuca Corridor) · Tren Interurbano México–Toluca (El Insurgente) — Full Line · Tren Maya (Mayan Train) — Full Network · News
Mexico City–Pachuca Full Corridor (Buenavista–Pachuca) is a commuter rail project in Mexico, currently under construction.
This 84 km commuter rail line is under construction in Mexico. The line uses 25 kV AC 60 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. SEDENA and SICT are delivering the project, with SEDENA as main contractor. Under construction since 2025, the line is scheduled to open in 2027.
Construction began in 2025, with completion expected in 2027.