Mexico City Metro Line 12 Post-Collapse Reconstruction

This 24.7 km metro line entered service in Mexico. It comprises 20 stations. The line uses 1500 V DC overhead electrification, national ATC signalling and 1435 mm standard gauge. STC Metro CDMX is del AIFA–Pachuca Train (Mexico City–Pachuca Corridor) · Tren Interurbano México–Toluca (El Insurgente) — Full Line · Tren Maya (Mayan Train) — Full Network · News

Mexico City Metro Line 12 Post-Collapse Reconstruction is a metro project in Mexico, currently operational.

This 24.7 km metro line entered service in Mexico. It comprises 20 stations. The line uses 1500 V DC overhead electrification, national ATC signalling and 1435 mm standard gauge. STC Metro CDMX is delivering the project, with Grupo Carso and CAF as main contractors. It opened in 2024, with an investment of MXN 4.5 bn (~USD 225 m).

Construction began in 2022 and the project opened in 2024.

The project has an estimated investment of MXN 4.50B.

Country
Mexico
Status
Operational
Investment
MXN 4.50B
Opened
2024
Length
24.7 km