This 32.5 km metro line is under construction in India. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Kolkata Metro Rail Corporation (KMRC) and RVNL ar Delhi-Meerut RRTS (NaMo Bharat) · Hyderabad Metro Phase 2 · Eastern Dedicated Freight Corridor (EDFC) · Indian Railways · News
Kolkata Metro Yellow Line (Noapara-Barasat) & Joka-Esplanade is a metro project in India, currently under construction.
This 32.5 km metro line is under construction in India. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Kolkata Metro Rail Corporation (KMRC) and RVNL are delivering the project, with IRCON, Afcons and ITD Cementation as main contractors. Under construction since 2010, the line is scheduled to open in 2027, with an investment of INR 71.0 bn (~USD 855 m).
Construction began in 2010, with completion expected in 2027.
The project has an estimated investment of ₹71.00B.