Botany Rail Duplication & Cabramatta Loop

This 4.6 km freight rail line entered service in Australia. The line uses diesel traction and 1435 mm standard gauge. Australian Rail Track Corporation (ARTC) is delivering the project, with John Holl Melbourne Metro Tunnel · Sydney Metro Western Sydney Airport · Gold Coast Light Rail Stage 3 (Broadbeach South – Burleigh Heads) · News

Botany Rail Duplication & Cabramatta Loop is a freight rail project in Australia, currently operational.

This 4.6 km freight rail line entered service in Australia. The line uses diesel traction and 1435 mm standard gauge. Australian Rail Track Corporation (ARTC) is delivering the project, with John Holland and Fulton Hogan as main contractors. It opened in 2024, with an investment of AUD 442 m (~USD 296 m).

Construction began in 2022 and the project opened in 2024.

The project has an estimated investment of A$442M.

Country
Australia
Status
Operational
Investment
A$442M
Opened
2024
Length
4.6 km