NEOM Connector Railway (Oxagon–The Line)

This 57 km rail upgrade is under construction in Saudi Arabia. It comprises 230 km/h design speed. The line uses 1435 mm standard gauge. NEOM is delivering the project, with Webuild–SAJCO JV as main c Haramain High Speed Railway (Makkah–Madinah) · News

NEOM Connector Railway (Oxagon–The Line) is a rail upgrade project in Saudi Arabia, currently under construction.

This 57 km rail upgrade is under construction in Saudi Arabia. It comprises 230 km/h design speed. The line uses 1435 mm standard gauge. NEOM is delivering the project, with Webuild–SAJCO JV as main contractor. Construction has been under way since 2023, with an investment of EUR 1.4 bn (~USD 1.5 bn).

Construction began in 2023.

The project has an estimated investment of €1.40B.

Country
Saudi Arabia
Status
Under Construction
Investment
€1.40B
Construction started
2023
Length
57 km