This 4.8 km metro line is being commissioned in Greece. It comprises 5 stations. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Attiko Metro S.A. is del Athens Metro Line 4 Phase A (Alsos Veikou–Evangelismos) · News
Thessaloniki Metro Line 1 Extension to Kalamaria is a metro project in Greece, currently testing commissioning.
This 4.8 km metro line is being commissioned in Greece. It comprises 5 stations. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Attiko Metro S.A. is delivering the project, with AKTOR A.T.E. as main contractor. Investment is EUR 518 m (~USD 560 m).
Construction began in 2013, with completion expected in 2026.
The project has an estimated investment of €518M.