Athens Metro Line 3 Extension to Piraeus (Haidari–Piraeus)

This 7.6 km metro line entered service in Greece. It comprises 6 stations and 7.55 km of tunnels. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Attiko Athens Metro Line 4 Phase A (Alsos Veikou–Evangelismos) · News

Athens Metro Line 3 Extension to Piraeus (Haidari–Piraeus) is a metro project in Greece, currently operational.

This 7.6 km metro line entered service in Greece. It comprises 6 stations and 7.55 km of tunnels. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Attiko Metro S.A. is delivering the project, with AVAX-Ghella-Alstom JV as main contractor. It opened in 2022, with an investment of EUR 730 m.

Construction began in 2012 and the project opened in 2022.

The project has an estimated investment of €730M.

Country
Greece
Status
Operational
Investment
€730M
Opened
2022
Length
7.6 km