Walk Bridge Replacement (Norwalk River)

This rail upgrade is under construction in United States. The line uses 25 kV AC 60 Hz electrification and 1435 mm standard gauge. Connecticut DOT is delivering the project. Under construction since 2 USA Los Angeles Metro D Line Extension · Brightline West (Las Vegas – Rancho Cucamonga High-Speed Rail) · USA Phoenix Valley Metro Extension · MTA New York · AECOM · News

Walk Bridge Replacement (Norwalk River) is a rail upgrade project in United States, currently under construction.

This rail upgrade is under construction in United States. The line uses 25 kV AC 60 Hz electrification and 1435 mm standard gauge. Connecticut DOT is delivering the project. Under construction since 2024, the line is scheduled to open in 2030, with an investment of USD 925 m.

Construction began in 2024, with completion expected in 2030.

The project has an estimated investment of $925M.

Country
United States
Status
Under Construction
Investment
$925M
Expected opening
2030