Valley Metro South Central Extension / Downtown Hub

This 8.9 km light rail line entered service in United States. It comprises 8 stations. The line uses 750 V DC overhead electrification and 1435 mm standard gauge. Valley Metro and City of Phoenix are USA Los Angeles Metro D Line Extension · Brightline West (Las Vegas – Rancho Cucamonga High-Speed Rail) · USA Phoenix Valley Metro Extension · MTA New York · AECOM · News

Valley Metro South Central Extension / Downtown Hub is a light rail project in United States, currently operational.

This 8.9 km light rail line entered service in United States. It comprises 8 stations. The line uses 750 V DC overhead electrification and 1435 mm standard gauge. Valley Metro and City of Phoenix are delivering the project, with Kiewit-McCarthy JV as main contractor. It opened in 2025, with an investment of USD 1.3 bn.

Construction began in 2019 and the project opened in 2025.

The project has an estimated investment of $1.34B.

Country
United States
Status
Operational
Investment
$1.34B
Opened
2025
Length
8.9 km