Taipei Metro Wanda–Zhonghe–Shulin Line (LG02)

This 22.1 km metro line is under construction in Taiwan. It comprises 18 stations. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Department of Rapid Tr News

Taipei Metro Wanda–Zhonghe–Shulin Line (LG02) is a metro project in Taiwan, currently under construction.

This 22.1 km metro line is under construction in Taiwan. It comprises 18 stations. The line uses 750 V DC third rail electrification, CBTC signalling and 1435 mm standard gauge. Department of Rapid Transit Systems (DORTS), Taipei City Government is delivering the project, with SYSTRA (systems integration) and Hyundai Rotem (rolling stock) as main contractors. Under construction since 2015, the line is scheduled to open in 2027, with an investment of TWD 156.0 bn (~USD 4.9 bn).

Construction began in 2015, with completion expected in 2027.

The project has an estimated investment of TWD 156.00B.

Country
Taiwan
Status
Under Construction
Investment
TWD 156.00B
Expected opening
2027
Length
22.1 km