Vienna–Bratislava Marchegg Rail Link Electrification

This 66 km electrification programme upgrades the existing Slovakia corridor to 25 kV AC 50 Hz. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. ŽSR ( News

Vienna–Bratislava Marchegg Rail Link Electrification is a rail upgrade project in Slovakia, currently operational.

This 66 km electrification programme upgrades the existing Slovakia corridor to 25 kV AC 50 Hz. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. ŽSR (Železnice Slovenskej republiky) is delivering the project. It opened in 2024, with an investment of EUR 11 m (~USD 12 m).

Construction began in 2022 and the project opened in 2024.

The project has an estimated investment of €11M.

Country
Slovakia
Status
Operational
Investment
€11M
Opened
2024
Length
66 km