This 3.9 km tram line entered service in Slovakia. It comprises 7 stations and 70 km/h design speed. The line uses 750 V DC overhead electrification and 1000 mm metre gauge. Hlavné mesto SR Bratislava News
Bratislava Tram Extension to Petržalka–Janíkov dvor is a tram project in Slovakia, currently operational.
This 3.9 km tram line entered service in Slovakia. It comprises 7 stations and 70 km/h design speed. The line uses 750 V DC overhead electrification and 1000 mm metre gauge. Hlavné mesto SR Bratislava (Bratislava City) is delivering the project, with Aldesa, Cedis and Hant BA (JV — NS MHD Petržalka) as main contractors. It opened in 2025, with an investment of EUR 75 m (~USD 82 m).
Construction began in 2022 and the project opened in 2025.
The project has an estimated investment of €75M.