Thomson-East Coast Line Stage 5 Extension (TEL5: Bedok South – Sungei Bedok)

This metro line is under construction in Singapore. It comprises 2 stations. The line uses 1.5 kV DC overhead electrification and 1435 mm standard gauge. Land Transport Authority (LTA) is delivering t News

Thomson-East Coast Line Stage 5 Extension (TEL5: Bedok South – Sungei Bedok) is a metro project in Singapore, currently under construction.

This metro line is under construction in Singapore. It comprises 2 stations. The line uses 1.5 kV DC overhead electrification and 1435 mm standard gauge. Land Transport Authority (LTA) is delivering the project. The line is scheduled to open in 2026.

Completion is expected in 2026.

Country
Singapore
Status
Under Construction
Expected opening
2026