Singapore Jurong Region Line (JRL)
Singapore · Asia · Metro
Project overview
This 24 km metro line is under construction in Singapore. It comprises 25 stations. The line uses 750 V DC third rail electrification and 1435 mm standard gauge. Land Transport Authority (LTA) is delivering the project, with Penta-Ocean Construction, ST Engineering Urban Solutions and Singapore One Rail (SBS Transit + RATP Dev) — operations as main contractors. The line is scheduled to open in 2028.

