This 1.96 km metro line entered service in Panama. It comprises 2 stations. The line uses 1.5 kV DC overhead electrification, CBTC signalling and 1435 mm standard gauge. Metro de Panamá SA is deliveri News
Panama Metro Line 2 Tocumen Airport Extension is a metro project in Panama, currently operational.
This 1.96 km metro line entered service in Panama. It comprises 2 stations. The line uses 1.5 kV DC overhead electrification, CBTC signalling and 1435 mm standard gauge. Metro de Panamá SA is delivering the project, with TYLin Group as main contractor. It opened in 2023.
Construction began in 2020 and the project opened in 2023.