This 186 km high-speed line entered service in Morocco. It comprises 320 km/h design speed. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 1 signalling and 1435 mm standard gauge. ONCF is d News
LGV Al Boraq (Tangier – Kenitra) is a high speed rail project in Morocco, currently operational.
This 186 km high-speed line entered service in Morocco. It comprises 320 km/h design speed. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 1 signalling and 1435 mm standard gauge. ONCF is delivering the project, with Ansaldo STS, Cofely Ineo and voestalpine as main contractors. It opened in 2018, with an investment of MAD 19.0 bn (~USD 2.0 bn).
Construction began in 2011 and the project opened in 2018.
The project has an estimated investment of MAD 19.00B.