This 47 km high-speed line is under construction in South Korea. It comprises 350 km/h design speed. The line uses ERTMS Level 2 signalling and 1435 mm standard gauge. Korea National Railway (KR Netwo News
Pyeongtaek–Osong Third Track (KTX Capacity Expansion) is a high speed rail project in South Korea, currently under construction.
This 47 km high-speed line is under construction in South Korea. It comprises 350 km/h design speed. The line uses ERTMS Level 2 signalling and 1435 mm standard gauge. Korea National Railway (KR Network) and MOLIT are delivering the project. Under construction since 2021, the line is scheduled to open in 2027, with an investment of USD 2.3 bn.
Construction began in 2021, with completion expected in 2027.