Israel Railways ETCS Level 2 Signalling Rollout

This signalling upgrade in Israel, deploying ERTMS Level 2. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. Israel Railways (ISR) is delivering the p News

Israel Railways ETCS Level 2 Signalling Rollout is a rail upgrade project in Israel, currently under construction.

This signalling upgrade in Israel, deploying ERTMS Level 2. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. Israel Railways (ISR) is delivering the project, with Alstom (onboard); trackside contractor unknown as main contractor. Under construction since 2018, the line is scheduled to open in 2027, with an investment of ILS 2.5 bn (~USD 686 m).

Construction began in 2018, with completion expected in 2027.

The project has an estimated investment of ILS 2.50B.

Country
Israel
Status
Under Construction
Investment
ILS 2.50B
Expected opening
2027