Relizane–Tiaret–Tissemsilt Railway

This 185 km rail upgrade is under construction in Algeria. It comprises 160 km/h design speed. The line uses diesel traction and 1435 mm standard gauge. ANESRIF is delivering the project, with FCC and News

Relizane–Tiaret–Tissemsilt Railway is a rail upgrade project in Algeria, currently under construction.

This 185 km rail upgrade is under construction in Algeria. It comprises 160 km/h design speed. The line uses diesel traction and 1435 mm standard gauge. ANESRIF is delivering the project, with FCC and ETRHB Haddad as main contractors. Construction has been under way since 2010, with an investment of EUR 936 m (~USD 1.1 bn).

Construction began in 2010.

The project has an estimated investment of €936M.

Country
Algeria
Status
Under Construction
Investment
€936M
Construction started
2010
Length
185 km