Annaba–Souk Ahras–Tébessa Eastern Mining Railway

This 422 km freight rail line is under construction in Algeria. The line uses diesel traction and 1435 mm standard gauge. ANESRIF and MANAL and ASMIDAL are delivering the project, with Cosider Travaux News

Annaba–Souk Ahras–Tébessa Eastern Mining Railway is a freight rail project in Algeria, currently under construction.

This 422 km freight rail line is under construction in Algeria. The line uses diesel traction and 1435 mm standard gauge. ANESRIF and MANAL and ASMIDAL are delivering the project, with Cosider Travaux Publics, Cosider Ouvrages d'Art and Infrarail as main contractors. Under construction since 2022, the line is scheduled to open in 2026.

Construction began in 2022, with completion expected in 2026.

Country
Algeria
Status
Under Construction
Expected opening
2026
Length
422 km