Shanghai Metro Line 18 Phase 2

This 8 km metro line entered service in China. It comprises 5 stations. The line uses 1500 V DC overhead electrification, CBTC signalling and 1435 mm standard gauge. Shanghai Shentong Metro Group is d China Railway (CR) · CRRC · News

Shanghai Metro Line 18 Phase 2 is a metro project in China, currently operational.

This 8 km metro line entered service in China. It comprises 5 stations. The line uses 1500 V DC overhead electrification, CBTC signalling and 1435 mm standard gauge. Shanghai Shentong Metro Group is delivering the project, with Shanghai Tunnel Engineering Co. and China Railway Construction Corporation (CRCC) as main contractors. It opened in 2025.

Construction began in 2021 and the project opened in 2025.

Country
China
Status
Operational
Opened
2025
Length
8 km