Bangabandhu Sheikh Mujib Railway Bridge over Jamuna

This 4.8 km conventional rail line entered service in Bangladesh. The line uses diesel traction and dual-gauge track. Bangladesh Railway is delivering the project, with Obayashi-Shimizu-JFE-IHI JV (OS Chittagong-Cox's Bazar Railway Phase 1 (Dohazari-Cox's Bazar) · News

Bangabandhu Sheikh Mujib Railway Bridge over Jamuna is a conventional rail project in Bangladesh, currently operational.

This 4.8 km conventional rail line entered service in Bangladesh. The line uses diesel traction and dual-gauge track. Bangladesh Railway is delivering the project, with Obayashi-Shimizu-JFE-IHI JV (OSJI JV) as main contractor. It opened in 2025, with an investment of USD 1.4 bn.

Construction began in 2020 and the project opened in 2025.

The project has an estimated investment of $1.45B.

Country
Bangladesh
Status
Operational
Investment
$1.45B
Opened
2025
Length
4.8 km