Bosnia-Herzegovina Corridor Vc Railway Rehabilitation (Doboj area section)

This 172 km rail upgrade is in feasibility stage in Bosnia and Herzegovina. It comprises 200 km/h design speed. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 2 signalling and 1435 mm stand News

Bosnia-Herzegovina Corridor Vc Railway Rehabilitation (Doboj area section) is a rail upgrade project in Bosnia and Herzegovina, currently feasibility study.

This 172 km rail upgrade is in feasibility stage in Bosnia and Herzegovina. It comprises 200 km/h design speed. The line uses 25 kV AC 50 Hz electrification, ERTMS Level 2 signalling and 1435 mm standard gauge. Željeznice Federacije BiH (ŽFBH) is delivering the project. Investment is EUR 191 m (~USD 210 m).

The project has an estimated investment of €191M.

Country
Bosnia and Herzegovina
Status
Feasibility Study
Investment
€191M
Length
172 km