This 7000 km freight rail line is currently suspended in Argentina. The line uses diesel traction and 1000 mm metre gauge. TAC and Belgrano Cargas y Logística SA are delivering the project, with CMEC News
Belgrano Cargas Railway Rehabilitation Programme (CMEC/CRRC Chinese Loan) is a freight rail project in Argentina, currently suspended.
This 7000 km freight rail line is currently suspended in Argentina. The line uses diesel traction and 1000 mm metre gauge. TAC and Belgrano Cargas y Logística SA are delivering the project, with CMEC and CRRC as main contractors. Investment is USD 4.7 bn.
Construction began in 2015.
The project has an estimated investment of $4.70B.