Etihad Rail Stage 2 Freight Network

This 605 km freight rail line entered service in United Arab Emirates. It comprises 120 km/h design speed. The line uses diesel traction, ERTMS Level 2 signalling and 1435 mm standard gauge. Etihad Ra News

Etihad Rail Stage 2 Freight Network is a freight rail project in United Arab Emirates, currently operational.

This 605 km freight rail line entered service in United Arab Emirates. It comprises 120 km/h design speed. The line uses diesel traction, ERTMS Level 2 signalling and 1435 mm standard gauge. Etihad Rail is delivering the project, with CCECC–Ghantoot JV (Package A), CRCC–NPC JV (Packages B+C) and Hitachi Rail STS (systems+integration) as main contractors. It opened in 2023.

The project opened in 2023.

Country
United Arab Emirates
Status
Operational
Opened
2023
Length
605 km